The roadmap

100 plants.
Ten years.

The development portfolio is structured across four states in a deliberate sequence — Telangana, Maharashtra, Tamil Nadu and Andhra Pradesh — with sixteen plants defined down to location and go-live date, and the national platform scaling to one hundred by 2047.

Telangana→ Maharashtra→ Tamil Nadu→ Andhra Pradesh→ India

Repeatable by design

How each plant gets built.

The sequence is engineered to repeat: the same discipline carries every plant from feasibility to first gas, and the queue is filed early — never after construction.

01 · 6–12 MO

Feasibility & feedstock

Substrate audits, yield modelling, offtake letters of intent, and interconnection screening.

02 · UP TO 12 MO

Approvals

Environmental and building consents, pollution-control approvals, and CBG quality certification pathways filed in parallel.

03 · 12–24 MO

Interconnection & offtake

The critical path: cascade and pipeline infrastructure, utility tie-ups, and industrial or OMC offtake — started on day one.

04 · 4–18 MO

Construction

Fixed-price execution. Modular digester packages can compress this phase to roughly four months.

05 · WEEKS

Commissioning

Gas certification, 72-hour performance runs, then CBG registration and first dispatch — the plant starts earning.

Featured projects

The portfolio
in the ground.

Beyond the plant roadmap, VSN's development portfolio spans hybrid renewables, circular hubs, and industrial waste-to-energy across India.

Biogas / CBG Render of a VSN compressed biogas facility with green digester domes
Andhra Pradesh · India

Greenfield Compressed Biogas Infrastructure

Commercial CBG production facility processing paddy straw and organic agricultural waste into clean CNG-grade fuel and organic fertilizers.

>96%CH₄ product
2Revenue streams
100%Residue feedstock
Solar & Wind Render of the wind-solar hybrid park with turbines above a solar array
Southern Grid · India

Wind–Solar Utility Hybrid Park

50 MW utility-scale hybrid generation hub combining solar arrays and wind power generation on one integrated site.

50 MWHybrid capacity
2Generation classes
1Grid injection point
Circular Hubs Aerial view of farmland with a VSN bioenergy facility and farming equipment
Pan-India regions

Multi-State Bioenergy Network

Connecting 2,000+ local farming partners for agricultural waste collection and bio-fertilizer soil distribution at scale.

2,000+Farming partners
2-wayWaste ⇄ fertilizer
MultiState footprint
Waste-to-Energy Render of the waste-to-energy tank farm and process building
Telangana & Karnataka

Waste-to-Energy Expansion Hubs

Transforming municipal organic solid waste and food-processing by-products into high-purity biomethane.

2States
2Waste streams
1Product: bio-CNG

The development portfolio

Sixteen plants,
down to the date.

Every plant below carries a defined location and an expected commercial go-live. The sequence starts in Telangana and moves south and west.

TELANGANA

6 PLANTS · 2028–2029
P-01NizamabadGO-LIVE 01.01.2028
P-02AdilabadGO-LIVE 01.04.2028
P-03NirmalGO-LIVE 01.07.2028
P-04MancherialGO-LIVE 01.10.2028
P-05AsifabadGO-LIVE 01.01.2029
P-06KamareddyGO-LIVE 01.04.2029

MAHARASHTRA

5 PLANTS · 2029–2030
P-07Kolhapur · Western MaharashtraGO-LIVE 01.07.2029
P-08Pune & Satara · regionGO-LIVE 01.10.2029
P-09Gadchiroli & Chandrapur · VidarbhaGO-LIVE 01.01.2030
P-10Hingoli & Washim · MarathwadaGO-LIVE 01.04.2030
P-11Jalgaon & Ahmednagar · Khandesh / CentralGO-LIVE 01.07.2030

TAMIL NADU

1 PLANT · 2030
P-12CoimbatoreGO-LIVE 01.10.2030

ANDHRA PRADESH

4 PLANTS · 2031
P-13SrikakulamGO-LIVE 01.01.2031
P-14VizianagaramGO-LIVE 01.04.2031
P-15NuzviduGO-LIVE 01.07.2031
P-16KurnoolGO-LIVE 01.10.2031

The national platform

Plants 17–100 · commissioned 2032 – 2047

The remaining plant locations will be progressively identified and added as the national expansion programme scales.

Partner with VSN →

Plant locations and expected commercial go-live dates per VSN Green Energy's state-wise development portfolio.

The foundation

Land first.

VSN's land position anchors the programme — plant sites and feedstock cultivation secured ahead of construction.

0

Acres of factory and plant land established for the CBG platform's development pipeline.

VSN Green Energy corporate profile
0

Acres of Napier grass feedstock land — the cultivated foundation of the agricultural resource strategy.

VSN Green Energy corporate profile

The first plant breaks ground in Telangana.

Nizamabad · expected commercial go-live 01.01.2028